on plapon gypsun installation, installation of gypsum Sagat distance to note In because very influential on the surface of gypsum plapon after in pairs. Today generally used within the framework of 600 mm, without considering thick gypsum board, it increases the likelihood of gypsum board bumpy. within the framework of the example that is often used
indeed kebayak now on installation of gypsum plapon, using the distance frame as shown above but it would be nice if you use the 480 mm spacing order, will produce more flat plapon pair due to construction within the framework of the couple closer together.
distance order for each thickness of the gypsum that is;
thick gypsum ceiling direction of mounting The maximum distance order
mm mm
----------------------------------------------------------------------------------
1.9.0 perpendicular 400
2.12,0 perpendicular 600
--------------------------------------------------------------------------------
Showing posts with label within the framework of the ceiling. Show all posts
Showing posts with label within the framework of the ceiling. Show all posts
Thursday, October 8, 2015
How to install the gypsum ceiling frame
Before installing ceiling board, first make order ceiling as a buffer.
In the process of installation of a suspended ceiling using a ceiling system. The system generates the lattice of the material in the form of a hollow frame, the position under the roof or concrete by using a series of wire as hanger. This order usually consists of wall angle (elbow letter L), main tee (hollow 2x4, and cross tee (hollow 4x4). Wall angle mounted on the perimeter of the room. While playing tee and cross tee is on the middle order as the main frame.
The installation process begins by determining the desired ceiling height.
Furthermore, installing wall angle around the perimeter walls of the room.
Create a pattern beforehand using threads. The trick distanced from the corner of the room, in order to distance the waste or the same side of the same length or width. This was done to facilitate pekerjaan.Pola need precision (right) with a distance left and right sides equally.
Furthermore hanger hanging from the ceiling or DAK betaon. This hanger hanger serves as the main frame, which form the main tee or main runner.
Main tee mounted any distance of 110 cm.
This installation starts from the corner of the room, or share rooms. While attached to the stem cross tee tee man who is ready, it crosses every 60 cm.Jarak play tee installation (hollow 2x4) must be within 60 cm / As, with each other
After all of the skeletal system installed properly, make sure that all components are installed properly, such as network cables, pipes pralon etc. Having completed all the above steps, then do the installation of gypsum board.
In the process of installation of a suspended ceiling using a ceiling system. The system generates the lattice of the material in the form of a hollow frame, the position under the roof or concrete by using a series of wire as hanger. This order usually consists of wall angle (elbow letter L), main tee (hollow 2x4, and cross tee (hollow 4x4). Wall angle mounted on the perimeter of the room. While playing tee and cross tee is on the middle order as the main frame.
The installation process begins by determining the desired ceiling height.
Furthermore, installing wall angle around the perimeter walls of the room.
Create a pattern beforehand using threads. The trick distanced from the corner of the room, in order to distance the waste or the same side of the same length or width. This was done to facilitate pekerjaan.Pola need precision (right) with a distance left and right sides equally.
Furthermore hanger hanging from the ceiling or DAK betaon. This hanger hanger serves as the main frame, which form the main tee or main runner.
Main tee mounted any distance of 110 cm.
This installation starts from the corner of the room, or share rooms. While attached to the stem cross tee tee man who is ready, it crosses every 60 cm.Jarak play tee installation (hollow 2x4) must be within 60 cm / As, with each other
After all of the skeletal system installed properly, make sure that all components are installed properly, such as network cables, pipes pralon etc. Having completed all the above steps, then do the installation of gypsum board.
Subscribe to:
Posts (Atom)